Saturday, October 10, 2015

Project Activity Log: T-FLex CAD Workshop (Session 1)

Hi!

EBT447 MATERIALS SELECTION AND DESIGN

Event: T-Flex CAD Workshop (Session 1)
Date: 3-4th October 2015
Venue: Bilik Seminar Tun Dr Mahathir Mohamad (UniMAP), Seriab


On the last 3rd and 4th of October, 2015:

  • We had one compulsory workshop to attend.
  • Each of the student need to bring their own laptop to install T-Flex CAD software (student version).
  • Mr. Mukridz was the person who responsible to guide all the student on how to use the software. 

Here I attached some of the images during the workshop program:

Figure 1: Classes completed with projector display for student to follow the step in the tutorial. 

Figure 2: Mr. Mukridz give an explanation to the student regarding to the problem faces by them.

Figure 3: All group were seated in the same row for the convenience of the project designing.
Figure 4: Location of the workshop.

Figure 5: All student need to do the tutorial provided in the workshop.

Figure 6: Student had some discussion regarding to the tutorial.

Figure 7: One of the plastic sample done by our team in the workshop.
Figure 8: Hollow sample made by our group.

Figure 9: Water bottle with unique design.

Figure 10: Assembly part. This is where all the part made were assemble to become one machine.


Assalam, have a great day and wish us all the best!

*Any positive comments for blog, product improvement, and tip are encourages.

Thank you! ;)

Thursday, September 24, 2015

Project Activity Log: Viva 1

Hi!

EBT447 MATERIALS SELECTION AND DESIGN

Event: VIVA 1
Date:17 September 2015
Venue: Meeting Room, PPKB


On the last September 17, 2015:

  • We had an important activity in the Bilik Mesyuarat at School of Materials Engineering for a proposal defence.
  • All 17 groups were scheduled for their presentation time.
  • Each of the group were evaluated by few panels. All the panels are mainly expert in the machinery and tools at School of Materials Engineering.
  • Each of the groups were provided 10 minutes presentation time and about 15 minutes questions and answer session.
  • During the presentation, all groups need to explain the advantages and benefits of their product.
  • Each of the members in the team also was questioned in order to ensure all assigned engineers do their works.   

Here I attached some of the images during the presentation day and presentation
schedule.

      Table 1: Group titles and their respective presentation time. 

Figure 1: All the student waiting for their turn to present their product at the PPKB Student Room.

Figure 2: Student prepared for their presentation in the Meeting Room.

Figure 3: Presentation of the product in front of the panels.  



Assalam, have a great day and wish us all the best!

*Any positive comments for blog, product improvement, and tip are encourages.

Thank you! ;)

Thursday, September 17, 2015

Project Activity Log: YouTube channel

We need to setup a YouTube channel and here it is:

Our YouTube channel link: Msd YEAR4 youtube channel

Feels free to have take a look on this humble channel and be happy to comment.

and give us thumbs up for uploaded videos.

But, for the moment, we dont have any video to upload yet.

Subscribe us! <3

Tuesday, September 15, 2015

Project Activity Log: Title and task of the project


Project Title:

Design and Fabrication of a device for Low Temperature Impedance Spectroscopy Analysis

Task:

Dear Engineers,


Our customer requested us to design and fabricate a device that enables them to utilize their Impedance Analyzer (IS) to perform analysis at temperature from sub- zero up to 200°C. The device should have a customized jig that could be attached to computer that has Impedance Spectroscopy analysis software. However, the jig must be safe to be used. Therefore, the outside temperature of the jig must be controlled. The jig must be linked to a controller that able to control the temperature of sample in the jig to remain at the desired temperature for real-time Impedance Spectroscopy analysis. Furthermore, the controller should be able to display real- temperature and the data logged temperature could be saved.


Therefore, your team is requested to present and submit your final complete proposal with technical design with specifications to our customer within 3 weeks from the date you receive this appointment. The meeting with our customer will be held tentatively on 29th September 2015. Upon the agreement of specific requirement with our customer, your team is required to fabricate the device and controller within three (3) month from the date of agreement. In addition, technical and user manuals must be provided during the delivery of equipment to our customer.